HVAC estimating has always been complex, but 2026 brings new challenges that can make or break your margins. Between refrigerant regulations, copper price volatility, and the specialized labor required for modern systems, the contractors who thrive will be those who adapt their estimating practices to current realities.
This guide covers the critical factors every HVAC contractor needs to consider when bidding work this year.
Tracking Refrigerant Costs and Regulations
The ongoing transition away from high-GWP refrigerants continues to impact HVAC pricing in 2026. R-410A prices remain elevated, while newer alternatives like R-32 and R-454B are becoming more common but require updated equipment and training.
What this means for your estimates:
- Get current refrigerant pricing for every bid, prices can change monthly
- Factor in potential price increases for long-duration projects
- Account for technician certification requirements for new refrigerants
- Consider recovery and disposal costs for system replacements
- Verify equipment compatibility with specified refrigerants
Many contractors are still using refrigerant costs from 2024 in their estimates. This is a quick way to turn a profitable job into a losing one. Build a habit of verifying current pricing with your supplier before finalizing any bid.
Managing Copper Price Volatility
Copper remains one of the most volatile materials in HVAC work. Line sets, refrigerant piping, and electrical components all depend on copper pricing that can swing 20% or more in a matter of months.
Strategies for managing copper costs:
Use current pricing: Never rely on prices from your last project. Get fresh quotes from multiple suppliers for any job with significant copper content.
Include escalation clauses: For projects spanning more than 60 days from bid to material purchase, include language that allows price adjustments if copper moves more than a specified percentage.
Consider pre-purchasing: For larger projects with predictable timelines, locking in material costs at bid time can protect your margins, just ensure you have secure storage and aren't tying up too much capital.
Track the market: Follow copper futures and industry forecasts. If you're bidding during a period of rising prices, build in a buffer. If prices are falling, you may have more flexibility.
Pricing Specialized Ductwork Labor
Not all ductwork is created equal, and your labor pricing needs to reflect that. The hours required to install spiral duct in an open ceiling are dramatically different from boxing out ductwork in a tight residential retrofit.
Factors that affect ductwork labor productivity:
- Access conditions: Attic work, tight mechanical rooms, and confined spaces can double or triple installation time
- Height: Anything requiring scaffolding or lifts adds setup time and reduces productivity
- Duct type: Flexible duct installs faster than rigid, spiral is faster than rectangular in most conditions
- Insulation requirements: Internal vs. external insulation, fire-rated wraps, and acoustic lining all add labor
- Coordination: Working around other trades or in occupied spaces significantly impacts productivity
Build a labor rate sheet that accounts for these variables. A base rate for "standard" conditions, with multipliers for difficult access, height work, and complex coordination. This prevents the common mistake of using the same labor rate for vastly different conditions.
Equipment Pricing Best Practices
HVAC equipment represents a major portion of most project costs, and small errors can have big impacts. Here's how to price equipment accurately:
Verify lead times: Equipment availability has improved since the supply chain disruptions of recent years, but popular models can still have extended lead times. A delay in equipment arrival can blow your project timeline and add costs.
Check for model changes: Manufacturers frequently update product lines. The unit you priced last quarter may have been replaced by a new model with different pricing and specifications.
Include all components: Don't forget controls, thermostats, condensate pumps, refrigerant line sets, and electrical disconnects. These "small" items add up quickly.
Account for rigging: Rooftop units, large air handlers, and equipment in difficult locations require crane time or specialized rigging. Get quotes for this work rather than guessing.
Startup, Testing, and Commissioning
One of the most commonly underestimated items in HVAC bids is the time required for proper startup and commissioning. Modern systems with variable speed drives, complex controls, and building automation integration require significant time to set up correctly.
Include dedicated time for:
- Refrigerant charging and verification
- Control programming and calibration
- Airflow balancing and adjustment
- Integration with building management systems
- Owner training and documentation
- Warranty registration and paperwork
Rushing through commissioning to meet a deadline often leads to callbacks, warranty claims, and unhappy customers. Build adequate time into your estimates upfront.
Bidding for Profit in 2026
The HVAC contractors who thrive in 2026 will be those who combine technical expertise with disciplined estimating practices. That means staying current on material costs, using realistic labor rates for actual site conditions, and never cutting corners on the details that separate profitable jobs from money-losers.
Professional estimating software designed for HVAC work helps you track all these variables, maintain consistent pricing, and produce professional proposals that win work at the right price.
Ready to streamline your HVAC estimating?
See how Costryx helps HVAC contractors bid more accurately and win more profitable work.
Request a Demo